PAYER READY CREDENTIALING & COMPLIANCE
ICD-10-CM 2026 · Effective October 1, 2025

ICD-10 O75.82

Billable / Specific

Onset (spontaneous) of labor after 37 completed weeks of gestation but before 39 completed weeks gestation, with delivery by (planned) cesarean section

O75
Block
1
Synonyms
0
LCDs
0
Payer Policies
0
Linked CPTs

About ICD-10-CM O75.82

ICD-10-CM code O75.82 represents Onset (spontaneous) of labor after 37 completed weeks of gestation but before 39 completed weeks gestation, with delivery by (planned) cesarean section. This is a billable/specific code in the Pregnancy, Childbirth, and Puerperium chapter (block O75). The 2026 edition of ICD-10-CM O75.82 became effective on October 1, 2025.

Coding Tips for O75.82

Specialist guidance from the PayerReady Medical Coding Team. Specificity warnings, HCC capture rules, sequencing notes.

Pregnancy chapter (O00-O9A): trimester required

Most O codes require a 7th character indicating trimester (1 = first, 2 = second, 3 = third). Some require fetus identification character. Code O09 (supervision of high-risk pregnancy) is required as a secondary code when applicable.

Inclusion Terms / Approximate Synonyms

Clinical terms and conditions classified under O75.82. Per CMS ICD-10-CM Tabular 2026.

  • Delivery by (planned) cesarean section occurring after 37 completed weeks of gestation but before 39 completed weeks gestation due to (spontaneous) onset of labor

Coding Notes

Code First

  • to specify reason for planned cesarean section such as:
  • cephalopelvic disproportion (normally formed fetus) (O33.9)
  • previous cesarean delivery (O34.21-)

Medicare LCD Coverage for O75.82

Local Coverage Determinations (LCDs) from CMS MACs that list O75.82 as a covered diagnosis.

No Medicare LCDs reference O75.82 as covered

This doesn't mean the code isn't covered, it means no MAC has issued a Local Coverage Determination naming this specific code. Coverage may still apply under National Coverage Determinations or general medical-necessity rules.

Commercial Payer Coverage

Coverage policies from major commercial payers referencing O75.82.

No commercial payer policies reference O75.82 on file

Our payer policy database covers Aetna, Cigna, Anthem, BCBS, Humana, and Medicare Advantage plans, but O75.82 doesn't currently appear in any indexed policy. The code may still be covered under standard plan benefits.

CPT Codes Commonly Billed with O75.82

Procedures frequently paired with this diagnosis based on PayerReady's Dx↔Px linkage data.

No procedure linkages on file for O75.82

We don't have CPT pairings indexed for this specific code yet. Use the CPT search above to find common procedures, or check your payer's published medical policy for code-specific guidance.

Convert O75.82 to ICD-9-CM

Per CMS General Equivalence Mappings (GEMs), useful for legacy data review and historical claim analysis.

ICD-10ICD-9Mapping Flags
O75.82 64981 10000
O75.82 64982 10000

Flags format (5 digits): Approximate · No Map · Combination · Scenario · Choice List. Source: CMS 2017 GEMs (final version).

ICD-10 O75.82, Billing FAQ

Is ICD-10 code O75.82 billable? +

Yes, O75.82 is a billable ICD-10-CM code that can appear as a primary or secondary diagnosis on claims.

What other names or terms map to O75.82? +

ICD-10 O75.82 includes: Delivery by (planned) cesarean section occurring after 37 completed weeks of gestation but before 39 completed weeks gestation due to (spontaneous) onset of labor.

What ICD-9 codes does O75.82 map to? +

Per CMS GEMs, O75.82 maps to ICD-9 codes: 64981, 64982. Useful for legacy data review and historical claim analysis.

Get the full PayerReady toolkit

Free access to CPT/ICD-10 lookup, denial appeals, fee comparator, and claim auditing with credentialing enrollment.

Start free →

Run this code through our claim audit tool

Check NCCI bundling, MUE limits, and modifier logic before submission.

Try the auditor →

Did this page help?

Quick signal so we know what to improve.

Thanks!

If you want a code reference page that doesn't exist yet, email coding@payerready.com.

Sorry to hear that.

Tell us what's missing or wrong: coding@payerready.com. We respond within 5 business days.

Reviewed by the PayerReady Medical Coding Team

Verified against the CMS 2026 code set on July 16, 2026.

Powered by 11K CPT · 98K ICD-10 · 860K MPFS rates · 4.5M NCCI edits · 9.5M NPIs. Our data methodology · About our coding team

Every month un-credentialed is revenue you never bill

Sign up free, add your first provider, and watch the pipeline start moving this week.

Ask CredBrain

Answers from your credentialing team's verified knowledge base

Hi, I'm CredBrain. I answer from your credentialing team's verified knowledge base: payer join paths, state rules, timelines, associate billing, and enrollment workflows. If I don't have a verified answer, I'll say so and point you to your team. What would you like to know?

Try asking